您的当前位置是:首页 > Company news > NYK Arcadia was successfully delivered on time > 正文
NYK Arcadia was successfully delivered on time
2015-11-15

NYK Arcadia was successfully delivered on time 

NYK Arcadia leaving CXG
NYK Arcadia had successfully completed a 12-day repair activity and left CXG Yard on 10am of September 9.
CXG Production Department attached high attention to this project. With the core target of ensuring the docking schedule and delivery plan, CXG workshops made a scientific and rigorous detailed repair plan for the project, which had led to a solid foundation for the on-time delivery. With joint effort of project team and workshop, the project had successfully greatly shorten the docking period and undock 2 days ahead of the schedule by clinging onto the schedule, especially the docking activities. The additional fairlead installation of afterward shrouding is the most difficult, as well as the most time-consuming activity affecting delivery schedule after undocking. With detailed and well-planned schedule, CXG project team is fully prepared for a systematical series of activities, including relocation of the fairlead, demolishment of the foundation and installation for the new equipment. With cooperation and joint effort from structural, docking and mechanical workshops, the whole fairlead system was completed 1 day ahead of the schedule and accepted by client and the class, which had underpinned the on-time delivery.
By outstanding performance in coordination and cooperation, CXG project team is highly regarded by both the client and the captain.

 
Contact us
访问量:6005

广州文冲船舶修造有限公司 版权所有
广州市南沙区龙穴街启航路10号 邮编: 511462
传真: 020-36666688 Email:office@chengxigz.cn
维护单位:中国船舶工业集团信息科技中心 地址:北京市西城区月坛北街5号
电话:08610-59518822 传真:+8610-59517959 Email:clients@shipbuildingec.com.cn
备案号:粤ICP备 07076892号